EDUCATION > Projects

Small capacity construction crane


Data retrieved from the FSB repository, on July 14 2017, https://repozitorij.fsb.hr/7299

Summary:

The labor starts with a short introduction which gives us the description of task which has to be realized. Afterwards there is a market analysis in which a review of existing products on the market is given. Then a function structure of a tipical crane is formed along with morphological matrix attached to it, which gives us possible solutions for each function. After selecting solutions for functions, the first concept is made, which can be changed during the elaboration. According to concept, each component of the crane is calculated and than non-standard components are designed with a main idea that every component should be as simple as possible for production. At the end of labor a 3D model and technical documentation of the crane in Solidworks is made.

Mentor:

Author:

Tomislav Šain

Year:

2017

Type:

Bachelor thesis

PDF:

Tomislav Šain - Bachelor thesis